The fees for architectural projects are determined according to the complexity of the problem (classes I-V) and the value of the investment based on the reference rates of the OAR.
TABLE 3
CALCULATION OF BASIC FEES IN THE FORM OF PROCENTAL RATES OF INVESTMENT VALUE FOR NEW BUILDINGS
|
Tranches of investment's value (without VAT) cost Constr. +Inst./ mp (euro) |
CLASS I quota % euro ≤240 |
CLASS II quota % euro 350 |
CLASS III quota % euro 500 |
CLASS IV quota % euro 700 |
CLASS V quota % euro ≥950 |
1 |
minimal tranch up to 40 000 euro design fee fee / mp Ad. (euro) mp |
5% 2 000 12,0 165 |
6,25% 2 500 22,0 115 |
7,5% 3 000 37,5 80 |
8,75% 3 500 61,5 57 |
10% 4 000 95,0 42 |
2 |
40 000 - 120 000 euro design fee cumulative tranches fee / mp Ad. (euro) mp |
4,6% 5 680 11,4 500 |
5,75% 7 100 20,6 345 |
6,9% 8 520 35,5 240 |
8,05% 9 940 58,4 170 |
9,2% 11 360 91,0 125 |
3 |
120 000 - 360 000 euro design fee cumulative tranches fee / mp Ad. (euro) mp |
4,2% 15 760 10,5 1500 |
5,25% 19 700 19,0 1035 |
6,3% 23 640 32,8 720 |
7,35% 27 580 53,5 515 |
8,4% 31 520 84,0 375 |
4 |
360 000 - 1 100 000 euro design fee cumulative tranches fee / mp AD (euro) mp |
3,8% 43 880 9,5 4580 |
4,75% 54 850 17,5 3140 |
5,7% 65 820 29,9 2200 |
6,65% 76 790 48,9 1570 |
7,6% 87 760 75,6 1160 |
5 |
1 100 000 - 3 300 000 euro design fee cumulative tranches fee / mp AD (euro) mp |
3,4% 118 680 8,6 13800 |
4,25% 148 350 15,7 9430 |
5,1% 178 020 27,0 6600 |
5,95% 207 690 44,2 4700 |
6,8% 237 360 68,2 3480 |
6 |
3 300 000 - 10 000 000 euro design fee cumulative tranches fee / mp AD (euro) mp |
3,0% 319 680 7,7 41500 |
3,75% 399 600 14,0 28570 |
4,5% 479 520 24,0 20000 |
5,25% 559 440 39,1 14300 |
6,0% 639 360 60,7 10525 |
7 |
10 000 000 - 30 000 000 e. design fee cumulative tranches fee/mp AD (euro) mp |
2,6% 839 680 6,7 125000 |
3,25% 1 049 600 12,2 85715 |
3,9% 1 259 520 21,0 60000 |
4,55% 1 469 440 34,2 42900 |
5,2% 1 679 360 53,2 31580 |
8 |
peste 30 000 000 euro design fee cumulative tranches fee/mp AD (euro) mp |
2,2% .............. 5,7 |
2,75% ............. 10,4 |
3,3% .............. 18,0 |
3,85% ............. 29,0 |
4,4% .............. 46,0 |
-
the design fees presented are the result of the calculation corresponding to the upper limit of the respective tranche;
-
for the design of the site organization, the percentages of Order 11N are kept.
Source: OAR - Guide for Architects